Now that the pump and outside lines have been tested and are working, the control room is finished off with filters and a holding tank, a pressure tank and filters. Note the heavy insulation for those -20 days and nights and the waterpfoof synthetic floor (Tim told Soaphole not to worry anout coating the floor so Soaphole did it while Tim was away. I think he does things like that just to screw with Tim.
June 27, 2022
June 27, 2022
